What is included in the overhaul of non-residential premises? Project for major renovation of the building and its approval

List of works for major repairs of apartment buildings approved at the legislative level, taking into account the climatic characteristics of the region and types of houses.

Overhaul of apartment buildings means eliminating faults, replacing worn parts of the facade, as well as installing auxiliary systems for better operation of the structure. The list of overhaul works is fixed at the federal level.

What is included in the overhaul of an apartment building?

Restoration begins with taking measurements, which serve as guidelines for laying electrical wiring, sewerage, risers and other parts of the house.

Free legal advice

Application sent successfully!

Our lawyer will contact you shortly and advise you.

Restoration work includes the following list:

  1. Monitoring the current condition of buildings, identifying deviations from standards, drawing up technical analysis and design and estimate documentation for the list of works.
  2. Repair work to restore worn-out elements of multi-apartment buildings - overhaul services affect only balconies, electrical systems, risers, blind areas, heating, but do not apply to concrete floors and the foundation of the building.
  3. Increasing the operational characteristics of an apartment building - the list of mandatory works includes the installation of modern key parts of water, heat, gas supply, modernized elevator shafts, heating rooms (boiler rooms). According to the regulations, a list of works is carried out to replace windows and doorways, if the situation requires it. If necessary, workers are engaged in redevelopment of premises, expanding the interior space at the expense of staircases and other rooms.
  4. Laying thermal insulation layers - window openings, entrances and vestibules are insulated. The list of works also includes replacing interpanel joints of the facade, especially in the northern regions of our country.
  5. Engineering work - specialized engineers are responsible for replacing non-functioning electrics. New main lines are being laid, and if the system of an apartment building needs additional security (triple buffering), then the current internal wall openings are expanded.
  6. Installation of metering devices and heat, gas and water supply meters. Major repairs of apartment buildings are among the list of works that affect the operational properties of the building. The overall savings of water, light, gas, etc. depend on energy metering.
  7. Roof replacement services are necessary to integrate roofing systems that do not have ventilation ducts in an apartment building.
  8. Compliance with design documentation - during the overhaul of a house, employees ensure that the building does not lose its architectural appearance and does not deviate from urban planning regulations.
  9. Technical supervision of compliance with all rules on the list of restoration measures.

Based on the results of the overhaul, the contractor submits the results according to the list of works, and the receiving party evaluates the services performed.

How does a major renovation of apartment buildings take place?

The Federal Law on Overhaul obliges apartment owners to pay for restoration work. Responsibility for the execution of reconstruction lies with municipalities or regional operators. They are tasked with monitoring compliance with the list of work performed.

Voting for major repairs in apartment buildings is done by the residents themselves. The general verdict on the need to restore the damaged parts is made at the Meeting of homeowners - one member from each family.

According to Art. 44 of the Housing Code of the Russian Federation, in order to approve the overhaul and begin fundraising, it is necessary to achieve no less than ⅔ votes (majority) of the number of members present at the meeting. The initiators of the Meeting are either individual owners or the management company (TSK).

The regional program for capital repairs of apartment buildings is approved at the state government level. After its approval, the regional operator informs residents about:

  1. Timing of major repairs (exact or approximate).
  2. List of restoration works.
  3. Cost of contractor services.
  4. Sources of financing for capital repairs.

Information is conveyed to residents no later than six months before the start of the overhaul program in a particular region of our country. The discussion continues for 3 months, after which homeowners send a decision to the regional operator, who, in turn, informs housing structures about this.

Mandatory work during major home renovations

The Housing Code establishes that types of work on capital repairs of apartment buildings are paid by owners of apartments and non-residential premises 8 months before the start of the regional program of capital repairs of apartment buildings.

The nature of the work depends on the overhaul budget. The law establishes the so-called minimum quota of contributions, the payment of which is mandatory. If necessary, residents can increase the amount of payments using Part 8.2 of Art. 156 Housing Code of the Russian Federation. In case of payment of the minimum tariff, the regional operator carries out a “cut-down” version of the overhaul.

List of required works:

  1. Foundation equipment (technical inspection).
  2. Repair of facade, roof, non-residential premises (painting work, replacement of panel slabs, thermal insulation of windows).
  3. Arrangement of engineering systems, heating, electrical wiring, sewerage.
  4. Checking the operability of elevator shafts (movement of passenger and freight elevators, suitability of shaft cables, operation of the elevator lifting mechanism).

Mandatory overhaul work may be supplemented by a list of other operations, for example, installing meters or roofing. Such work requires additional funds. The budget increase is discussed at the same meeting of homeowners in an apartment building. Voting in the amount of ⅔ of the quota of all those present automatically obliges apartment owners to pay additional fees.

Today, entrepreneurship is developing very actively. Large networks are expanding, new offices and branches are opening. However, before starting work, it is necessary to create suitable conditions for employees and equipment. But neither the employees nor the management have the time to engage in transformation. There are specialists for this. Most businessmen ignore damage that does not disappear, thereby prolonging repair time. Fortunately, today many companies offer services major renovation of non-residential premises. It is difficult to single out worthy candidates among the candidates. RepairVMSK occupies a leading position in the repair services market. Our organization has been delighting its customers with quality and original designs for a long time. By ordering repairs from us, you will forget about repairs for a long time, doing effective things that contribute to the prosperity of your business.


Advantages of RepairVMSK

There are always many applicants for vacancies in our organization. We select the best from all of them. Our employees periodically study with the best teachers, improving their skills. A diverse work profile helps to gain experience in quickly finding an approach to solving a problem of any complexity and scope. Specialists can offer many different original designs that will increase production efficiency and improve the internal friendly atmosphere of the team.

Specialists work with high-quality materials from manufacturers. All selections presented are free of charge. The entire wide range has excellent characteristics. Endowed with increased resistance to moisture, sudden temperature changes, mechanical and atmospheric influences, it is durable and durable. In addition to the base, workers use special additional treatments. Harmless components improve the appearance and service life of structures. All products have certificates of high quality and environmental safety.
In the process, repairmen use high-quality equipment and proven, convenient tools. Modern equipment significantly speeds up and facilitates the process.

The conscientiousness of the overhaul of non-residential premises is proven by positive customer reviews, numerous certificates and letters of gratitude. After the cooperation is completed, you can also thank the workers.


Sequence of work

The company is happy to create convenience for customers. You can order the service without leaving your home. To do this, you just need to fill out an application on our official website. The manager will call you shortly, clarify the details and arrange a meeting. A specialist will arrive on site at the agreed time for a preliminary assessment. Workers independently accurately measure the required volume of materials, which avoids excess.

After this, several projects are developed. Experienced professionals will suggest the best option that will help increase productivity. Design will clearly show the view after major renovation of non-residential premises.

Then the best lawyers draw up a mutually beneficial deal. It will indicate deadlines that the masters never violate; on the contrary, they try to complete everything earlier. Workers can also go out on holidays and weekends, which will speed up the process.

An approximate estimate is calculated. The final price rarely differs from the initial price. This can happen only due to changes in the project. By the way, you can calculate the estimated cost of the service yourself. But you should understand that only a professional will give the exact numbers after inspecting the area.

The entire package of documents must be agreed upon and signed by the client.

After the formalities, a step-by-step plan is prepared according to which employees will act. Each stage is checked by a supervisor. The team is guided by the legislation of the Russian Federation, established construction standards and rules. First, furniture and appliances are removed. Once completed, everything is put back in its place and the trash is taken out.

We work in all districts of Moscow and Moscow Region:

Central Administrative District of the Central Administrative District:
Arbat, Basmanny, Zamoskvorechye, Krasnoselsky, Meshchansky, Presnensky, Tagansky, Tverskoy, Khamovniki, Yakimanka.

Northern Administrative District of the Northern Administrative Okrug:
Airport, Begovoy, Beskudnikovsky, Voykovsky, Golovinsky, Degunino East, Degunino West, Dmitrovsky, Koptevo, Levoberezhny, Molzhaninovsky, Savelovsky, Sokol, Timiryazevsky, Khovrino, Khoroshevsky.

North-Eastern Administrative Okrug NEAD:
Alekseevsky, Altufevsky, Babushkinsky, Bibirevo, Butyrsky, Lianozovo, Losinoostrovsky, Marfino, Maryina Roshcha, Medvedkovo North, Medvedkovo South, Ostankino, Otradnoye, Rostokino, Sviblovo, Severny, Yaroslavsky.

Eastern administrative district of the Eastern Administrative District:
Bogorodskoye, Veshnyaki, Vostochny, Golyanovo, Ivanovskoye, Izmailovo East, Izmailovo, Izmailovo North, Kosino Ukhtomsky, Metrogorodok, Novogireevo, Novokosino, Perovo, Preobrazhenskoye, Sokolinaya Gora, Sokolniki.

South-Eastern Administrative District of the South-Eastern Administrative District:
Vykhino-Zhulebino, Kapotnya, Kuzminki, Lefortovo, Lyublino, Maryino, Nekrasovka, Nizhny Novgorod, Printers, Ryazan, Tekstilshchiki, Yuzhnoportovy.

Southern Administrative District of the Southern Administrative Okrug:
Biryulyovo Eastern, Biryulyovo Western, Brateevo, Danilovsky, Donskoy, Zyablikovo, Moskvorechye-Saburovo, Nagatino-Sadovniki, Nagatinsky Zaton, Nagorny, Orekhovo-Borisovo Northern, Orekhovo-Borisovo Southern, Tsaritsyno, Chertanovo Northern, Chertanovo Central, Chertanovo Southern.

South-Western Administrative District of the South-Western Administrative District:
Academichesky, Butovo North, Butovo South, Gagarinsky, Zyuzino, Konkovo, Kotlovka, Lomonosovsky, Obruchevsky, Teply Stan, Cheryomushki, Yasenevo.

North-Western Administrative Okrug North-Western Administrative Okrug:
Vnukovo, Dorogomilovo, Krylatskoye, Kuntsevo, Mozhaisky, Novo-Peredelkino, Ochakovo-Matveevskoye, Vernadskogo Avenue, Ramenki, Solntsevo, Troparevo-Nikulino, Filyovsky Park, Fili-Davydkovo.

Western Administrative Okrug CJSC:
Kurkino, Mitino, Pokrovskoye-Streshnevo, Strogino, Tushino North, Tushino South, Khoroshevo-Mnevniki, Shchukino. Zelenograd administrative district ZelAO: Kryukovo, Matushkino, Savelki, Staroe Kryukovo

According to paragraph 1 of Article 616 of the Civil Code (Civil Code), the lessor is obliged to carry out at his own expense major repairs of the leased property, unless otherwise provided by law, other legal acts or the lease agreement.

Thus, if the parties to the agreement have not indicated the distribution of responsibilities for maintaining the property in working condition, then the general rule applies: the lessor is recognized as responsible for major repairs, and the tenant for current repairs. In addition, the tenant is also obliged to maintain the property in good condition and bear the costs of maintaining the property.

A person obligated to carry out a certain type of repair bears the costs associated with fulfilling this obligation. There can be no talk of any return or other compensation for the funds spent (clause 2 of Article 616 of the Civil Code).

Major and current repairs: concept


Types of repairs are defined in the Methodology for determining the cost of construction products on the territory of the Russian Federation, approved by Resolution of the State Construction Committee of Russia dated March 5, 2004 No. 15/1 (methodology). At the same time, the Methodology only superficially defines the types of repairs.

Major repairs of buildings and structures include work to restore or replace individual parts of buildings (structures) or entire structures, parts and engineering equipment due to their physical wear and tear with more durable and economical ones that improve their performance.

Major repairs of external utilities and improvement facilities include repairs of water supply, sewerage, heat and gas and electricity networks, landscaping of courtyard areas, repair of paths, driveways and sidewalks, etc.

Preventive (current) repairs consist of systematically and timely work carried out to prevent wear of structures, finishing, engineering equipment, as well as work to eliminate minor damage and malfunctions.

According to the Resolution of the State Committee of the Council of Ministers of the USSR for Construction Affairs dated December 29, 1973 No. 279, major repairs are:

  • replacing partitions with more advanced designs;
  • changing the flooring to something more durable and durable;
  • installation of new window and door units;
  • partial or complete replacement of pipes inside the building, etc.
The owner pays for all this work.

As a rule, the question of determining the type of work and classifying them as the appropriate type of repair sometimes causes difficulties. In this case, a forensic construction examination is appointed.

Current repairs must be carried out by the tenant


According to the Construction Standards VSN58-88(r), current repairs must be carried out at a frequency that ensures the effective operation of the facility from the moment of completion of its construction (major repairs) until the moment it is placed for the next major repairs (reconstruction). In this case, natural and climatic conditions, design solutions, technical condition and operating mode of the building or facility must be taken into account.

The list of main works for routine repairs of buildings and facilities contains a list of works that constitute routine repairs, presented in the attached file:

In addition, there are lists of works for such objects as:

  • window and door fillings, translucent structures;
  • partitions;
  • stairs, balconies, porches, umbrellas, canopies over the entrances to the entrances, balconies of the upper floors;
  • floors;
  • interior decoration;
  • exterior decoration;
  • ventilation;
  • water supply and sewerage, hot water supply (in-house systems);
  • electrical low-current devices;
  • external landscaping.
VSN58-88(r) also has a section that is devoted to work for tenants living in apartments (landlords). Unlike the list of current works, which is similar to the list of major repairs, the list of works for employers is not so large and includes the following works:
  • painting ceilings and walls of residential and utility rooms of apartments, loggias, balcony shelves;
  • wallpapering walls and ceilings;
  • painting of window sashes and balcony panels, external and internal sides, painting of floors in residential and utility rooms, sanding of parquet floors;
  • painting of radiators, central heating pipes, gas pipelines, water supply and sewerage;
  • painting external walls from the landlord's material for residents of one-story single-apartment buildings.
  • replacement of window, door and stove appliances, insertion of glass. Replacement or installation of additional taps, mixers and other equipment, replacement of door panels, built-in cabinets and finishing of premises for the purpose of improving the apartment (carried out by the tenant in agreement with the landlord (housing maintenance organization);
  • repair or change of electrical wiring from the entrance to the apartment, change of electrical appliances, etc.
  • work to improve the finishing of apartments;
  • repair of plaster walls, ceilings, partitions in separate sheets in residential apartments;
  • work on the reconstruction and redevelopment of residential premises in accordance with duly approved projects in order to increase the level of improvement according to the orders of premises tenants;
  • replacement and repair of floor coverings.
The appendices to VSN58-88(r) are advisory in nature, so it is not necessary to follow them.

Major repairs are carried out by the landlord


Major repairs should include troubleshooting all worn-out elements, restoration or replacement (except for the complete replacement of stone and concrete foundations, load-bearing walls and frames) with more durable and economical ones that improve the performance of the buildings being repaired. At the same time, economically feasible modernization of a building or facility can be carried out: improving the layout, increasing the quantity and quality of services, equipping with missing types of engineering equipment, and improving the surrounding area.

Major repairs and reconstruction must be carried out in compliance with the current rules for the organization, production and acceptance of repair and construction work, labor protection and fire safety rules.

According to paragraph 1 of Article 616 of the Civil Code, major repairs must be carried out within the period established by the contract, and if it is not determined by the contract or is caused by urgent need, within a reasonable time.

Violation by the lessor of the obligation to carry out major repairs gives the lessee the right to choose:

  • carry out major repairs provided for in the contract or caused by urgent need, and recover the cost of repairs from the lessor or offset it against the rent;
  • demand a corresponding reduction in rent;
  • demand termination of the contract and compensation for losses.

© We draw the special attention of our colleagues to the need to refer to "

Repair work, as a rule, depending on the frequency of implementation, is divided into two types: current repairs and major.

List of major repair works

Lists of types of major repair work are contained in departmental acts (Regulations, Norms and Rules..., Instructions, Recommendations, etc..). These lists of types of work vary depending on the type of capital construction project and its purpose.

Types of work are given in the appendices to departmental regulations, the texts of which are given in the attachment to this publication:

Appendix 8. List of works for major repairs of buildings and structures ( Decree of the USSR State Construction Committee dated December 29, 1973 N 279 "On approval of the Regulations on carrying out scheduled preventive maintenance of industrial buildings and structures" (together with "MDS 13-14.2000..."))

Appendix No. 8. Approximate list of work performed during major repairs of housing stock ( Resolution of the State Construction Committee of the Russian Federation dated September 27, 2003 N 170 “On approval of the Rules and Standards for the technical operation of the housing stock”)

Appendix 9. List of works for major repairs of buildings and structures ( Order of the Ministry of Justice of Russia dated September 28, 2001 N 276 (as amended on January 24, 2006) “On approval of instructions for the technical operation of buildings and structures of institutions of the penal system”)

Table 2.3. List of work on major repairs of apartment buildings to be included in the work financed from funds provided for by Federal Law N 185-FZ ( )

Definition of the concept of “major repairs” in the legal regulations

Major renovation- repairs carried out to restore the technical and economic characteristics of an object to values ​​close to design, with the replacement or restoration of any component parts ( Order of the State Construction Committee of the Russian Federation dated December 13, 2000 N 285 "On approval of the Standard Instructions for the technical operation of heating networks of municipal heating systems").

Major renovation- carrying out a set of construction works and organizational and technical measures to eliminate physical and moral wear and tear, not related to changes in the main technical and economic indicators of the building and functional purpose, providing for the restoration of its resource with partial replacement, if necessary, of structural elements and systems of engineering equipment, as well as improvement operational indicators ( Decree of the Moscow Government dated July 30, 2002 N 586-PP (as amended on December 23, 2015) “On approval of the Regulations on the unified procedure for pre-design and design preparation of the construction of utilities, structures and road transport facilities in the city of Moscow”).

Major repairs of capital construction projects(except for linear objects) - replacement and (or) restoration of building structures of capital construction objects or elements of such structures, with the exception of load-bearing building structures, replacement and (or) restoration of engineering support systems and networks of engineering support of capital construction objects or their elements, as well as the replacement of individual elements of load-bearing building structures with similar or other elements that improve the performance of such structures and (or) restoration of these elements ( (as amended on June 18, 2017)

Major repairs of buildings and structures

For major repairs of buildings and structures includes work on the restoration or replacement of individual parts of buildings (structures) or entire structures, parts and engineering equipment due to their physical wear and tear with more durable and economical ones that improve their performance ( Resolution of the State Construction Committee of Russia dated 03/05/2004 N 15/1 (as amended on 06/16/2014) "On approval and implementation of the Methodology for determining the cost of construction products on the territory of the Russian Federation" (together with "MDS 81-35.2004...")).

Major renovation of the building- a set of construction and organizational and technical measures to eliminate physical and functional (moral) wear and tear, which do not involve changes in the main technical and economic indicators of a building or structure, including, if necessary, the replacement of individual or all structural elements (except for non-replaceable ones) and engineering systems equipment with their modernization. Major repairs do not extend the service life of buildings, since they are determined by the most durable elements that are not replaced during repairs ( "Methodological recommendations for the formation of the scope of work for the overhaul of apartment buildings financed from funds provided for by Federal Law of July 21, 2007 N 185-FZ "On the Fund for Assistance to the Reform of Housing and Communal Services" (approved by the State Corporation "Fund for Assistance to the Reform of Housing and Communal Services" 02/15/2013)

Major renovation of an apartment building

Major renovation of an apartment building- carrying out and (or) provision of work and (or) services provided for by this Federal Law to eliminate malfunctions of worn-out structural elements of the common property of the owners of premises in an apartment building (hereinafter referred to as the common property in an apartment building), including their restoration or replacement, in in order to improve the performance characteristics of common property in an apartment building ( Article 2 of the Federal Law of July 21, 2007 N 185-FZ (as amended on June 23, 2016) “On the Fund for Assistance to the Reform of Housing and Communal Services”).

Major repairs of the common property of an apartment building: a set of works (services) for the replacement and (or) restoration (repair) of structures, parts, engineering support systems, individual elements of load-bearing structures of an apartment building that have lost their load-bearing and (or) functional capacity during operation to similar or other improving indicators up to their standard state, when the volume of such work exceeds current repairs ( )

Types of major repairs

Comprehensive and selective overhaul

Overhaul is divided into comprehensive overhaul and selective overhaul.
a) is a repair with the replacement of structural elements and engineering equipment and their modernization. It includes work covering the entire building as a whole or its individual sections, in which their physical and functional wear and tear is compensated.
b) is a repair with full or partial replacement of individual structural elements of buildings and structures or equipment, aimed at full compensation of their physical and partially functional wear.
Classification as a type of major repair depends on the technical condition of the buildings designated for repair, as well as the quality of their layout and the degree of internal improvement ( "Methodological recommendations for the formation of the scope of work for the overhaul of apartment buildings financed from funds provided for by Federal Law of July 21, 2007 N 185-FZ "On the Fund for Assistance to the Reform of Housing and Communal Services" (approved by the State Corporation "Fund for Assistance to the Reform of Housing and Communal Services" 02/15/2013))

Comprehensive overhaul: replacement, restoration and (or) repair of the common property of an apartment building or its individual parts, carried out in relation to the majority of the common property of the apartment building ( "GOST R 51929-2014. National standard of the Russian Federation. Housing and communal services and management of apartment buildings. Terms and definitions" (approved and put into effect by Order of Rosstandart dated June 11, 2014 N 543-st)

Comprehensive overhaul- covers all elements of the building, provides for the simultaneous restoration of all worn-out structural elements, engineering equipment and increasing the degree of improvement of the building as a whole, eliminating physical and moral wear and tear. Carrying out the next comprehensive overhaul of a building or structure is impractical in cases where the demolition or relocation of buildings or structures is planned in connection with the upcoming construction of another building or structure on the site they occupy, reconstruction of the building is planned, or dismantling of the building is planned due to general disrepair. In these cases, work must be carried out to maintain the structures of the building or structure in a condition that ensures their normal operation during the appropriate period (before demolition or reconstruction) ( )

Selective overhaul: replacement (restoration) of the common property of an apartment building or its individual parts, carried out in relation to a smaller part (some parts) of the common property of an apartment building ( "GOST R 51929-2014. National standard of the Russian Federation. Housing and communal services and management of apartment buildings. Terms and definitions" (approved and put into effect by Order of Rosstandart dated June 11, 2014 N 543-st)

Selective overhaul- covers individual structural elements of a building or its engineering equipment, while eliminating the physical wear and tear of individual elements and technical systems of the building. Selective overhaul is carried out in cases where a comprehensive overhaul of a building can cause serious interference in the operation of the facility, with significant wear and tear of individual structures that threatens the safety of the remaining parts of the building, when it is economically infeasible to carry out a comprehensive overhaul according to the restrictions given in the definition of a comprehensive overhaul ( Decree of the Moscow Government dated September 29, 2010 N 849-PP (as amended on July 7, 2015) “On approval of the Regulations for the overhaul of real estate objects that are state-owned by the city of Moscow and transferred to trust management”)

Emergency overhaul- repair or replacement of all structural elements, devices, engineering equipment systems that have failed as a result of accidents, natural disasters, terrorist acts and vandalism ( Decree of the Moscow Government dated September 29, 2010 N 849-PP (as amended on July 7, 2015) “On approval of the Regulations for the overhaul of real estate objects that are state-owned by the city of Moscow and transferred to trust management”)

Major repairs of external utilities

For major repairs of external utilities and improvement facilities include repairs of water supply networks, sewerage, heat and gas supply and electricity supply, landscaping of courtyard areas, repair of paths, driveways and sidewalks, etc. ( Resolution of the State Construction Committee of Russia dated 03/05/2004 N 15/1 (as amended on 06/16/2014) "On approval and implementation of the Methodology for determining the cost of construction products on the territory of the Russian Federation" (together with "MDS 81-35.2004...")

Major road repairs

Major road repairs- a set of works to replace and (or) restore structural elements of a highway, road structures and (or) their parts, the implementation of which is carried out within the established permissible values ​​and technical characteristics of the class and category of the highway and the implementation of which affects the structural and other reliability characteristics and safety of the highway and the boundaries of the right of way of the highway do not change ( Art. 3 of the Federal Law of November 8, 2007 N 257-FZ (as amended on February 7, 2017) “On highways and road activities in the Russian Federation and on amendments to certain legislative acts of the Russian Federation”)

Major road repairs- a set of works in which the complete restoration and improvement of the performance of road pavement and coating, subgrade and road structures is carried out, worn structures and parts are replaced or replaced with the most durable and durable ones, an increase in the geometric parameters of the road taking into account the increase in traffic intensity and axle loads cars within the limits corresponding to the category established for the road being repaired, without increasing the width of the roadbed along the main length of the road ( Order of the Ministry of Housing and Communal Services of the Moscow Region dated June 29, 2015 N 125-RV "On approval of the Rules for landscaping the territory of the Balashikha urban district of the Moscow region")

Deadline for major repairs. Reasonable time

The timing of major repairs is either established by the parties or established by regulatory legal acts (LLA). If there is no indication of the timing of repairs in the contract or regulation, then it is carried out within a reasonable time.

The concept of a “reasonable period” is traditional for civil law and is mentioned repeatedly in the norms of the Civil Code of the Russian Federation (see Article 314 of the Civil Code of the Russian Federation, in relation to collateral relations - clause 4 of Article 345, clause 1 of Article 358 of the Civil Code of the Russian Federation).

A reasonable period for carrying out major repairs depends on the condition of the property, its properties, climate characteristics, features of major repairs, technical capabilities and other reasons.

In addition, the regulatory legal acts may provide for specific terms for carrying out repairs, and may also establish the procedure for determining them and establish the frequency of certain types of repair work.

Attachments:

; Appendix 8 to the Resolution of the USSR State Construction Committee dated December 29, 1973 N 279 "On approval of the Regulations on carrying out scheduled preventive maintenance of industrial buildings and structures" (together with "MDS 13-14.2000...")

Appendix 8

SCROLL
OVERHAUL REPAIR OF BUILDINGS AND STRUCTURES

A. BY BUILDINGS

I. Foundations

1. Changing wooden chairs or replacing them with stone or concrete pillars.
2. Partial relocation (up to 10%), as well as strengthening of stone foundations and basement walls, not associated with the superstructure of the building or additional loads from newly installed equipment.
3. Restoration of vertical and horizontal insulation of foundations.
4. Restoration of the existing blind area around the building (more than 20% of the total area of ​​the blind area).
5. Repair of existing drains around the building.
6. Replacement of single collapsing stone and concrete pillars.

II. Walls and columns

1. Seal cracks in brick or stone walls, clearing grooves, and bandaging seams with old masonry.
2. Construction and repair of structures that strengthen stone walls.
3. Relaying of dilapidated brick cornices, lintels of pit parapets and protruding parts of walls.
4. Relaying and repair of individual dilapidated sections of stone walls up to 20% of the total volume of masonry, not associated with the superstructure of the building or additional loads from newly installed equipment.
5. Strengthening reinforced concrete and stone columns with clips.
6. Repair and partial replacement (up to 20% of the total volume) of columns, not associated with additional loads from newly installed equipment.
7. Change of fillers in walls with stone, reinforced concrete and metal frames (up to 40%).
8. Replacement of dilapidated crowns of log or cobblestone walls (up to 20% of the total surface of the walls).
9. Continuous caulking of log or cobblestone walls.
10. Partial replacement of sheathing, backfill and slab insulation of frame walls (up to 50% of the total wall area).
11. Replacement or repair of cladding and insulation of wooden plinths.
12. Repair of stone plinths of wooden walls with their relocation up to 50% of the total volume.
13. Re-installation and replacement of worn-out clamps of log and cobblestone walls.

III. Partitions

1. Repair, replacement and replacement of worn partitions with more advanced designs of all types of partitions.
2. When carrying out major repairs of partitions, partial redevelopment is allowed with an increase in the total area of ​​the partitions by no more than 20%.

IV. Roofs and coverings

1. Replacement of dilapidated wooden covering trusses or replacing them with prefabricated reinforced concrete ones.
2. Complete or partial replacement of dilapidated metal and reinforced concrete trusses, as well as replacement of metal trusses with prefabricated reinforced concrete trusses.
3. Strengthening trusses when changing types of covering (replacing wood slabs with prefabricated reinforced concrete, cold coverings with warm ones, etc.), when suspending lifting devices, as well as in case of corrosion of components and other elements of metal and prefabricated reinforced concrete trusses.
4. Partial or complete replacement of rafters, mauerlats and sheathing.
5. Repair of load-bearing structures of skylights.
6. Repair of devices for opening the covers of skylights.
7. Partial or complete replacement of dilapidated coating elements, as well as replacing them with more advanced and durable ones.
8. Partial (over 10% of the total roof area) or complete replacement or replacement of all types of roofing.
9. Reconstruction of roofs due to replacement of roofing material.
10. Partial or complete replacement of wall gutters, slopes and coverings of chimneys and other protruding devices above the roof.

V. Interfloor ceilings and floors

1. Repair or replacement of interfloor ceilings.
2. Replacement of individual structures or floors as a whole with more advanced and durable structures.
3. Strengthening all types of interfloor and attic floors.
4. Partial (more than 10% of the total floor area in the building) or complete replacement of all types of floors and their bases.
5. Reconstruction of floors during repairs with replacement with stronger and more durable materials. In this case, the type of floors must comply with the requirements of the standards and technical conditions for new construction.

VI. Windows, doors and gates

1. Complete replacement of dilapidated window and door units, as well as gates of production buildings.

VII. Stairs and porches

1. Partial or complete replacement of staircases, ramps and porches.
2. Change and strengthening of all types of stairs and their individual elements.

VIII. Internal plastering, facing
and painting works

1. Renewal of plastering of all premises and repair of plaster in an amount of more than 10% of the total plastered surface.
2. Change of wall cladding in an amount of more than 10% of the total area of ​​veneered surfaces.
3. Continuous anti-corrosion painting of metal structures.

IX. Facades

1. Repair and renewal of cladding over an area of ​​more than 10% of the cladding surface.
2. Complete or partial (more than 10%) restoration of plaster.
3. Complete restoration of rods, cornices, belts, sandriks, etc.
4. Renewal of molded parts.
5. Continuous painting with stable compounds.
6. Cleaning the facade with sandblasting machines.
7. Change of balcony slabs and fences.
8. Change of coverings of protruding parts of the building.

1. Complete refurbishment of all types of heating stoves, chimneys and their bases.
2. Re-equipment of furnaces to burn coal and gas.
3. Complete refurbishment of kitchen stoves.

XI. Central heating

1. Replacement of individual sections and assemblies of heating boilers, boiler units, or complete replacement of boiler units (if the boiler unit is not an independent inventory item).
2. Repair and replacement of expanders, condensation traps and other network equipment.
3. Repair and re-laying of foundations for boilers.
4. Automation of boiler rooms.
5. Transfer from stove heating to central heating.
6. Changing heating registers.
7. Connection of buildings to heating networks (at a distance from the building to the network of no more than 100 m).

XII. Ventilation

1. Partial or complete replacement of air ducts.
2. Changing fans.
3. Rewinding or changing electric motors.
4. Change of dampers, deflectors, throttle valves, blinds.
5. Partial or complete replacement of ventilation ducts.
6. Change of air heaters.
7. Change of heating units.
8. Changing filters.
9. Change of cyclones.
10. Change of individual chamber designs.

XIII. Water supply and sewerage

1. Partial or complete replacement of the pipeline inside the building, including water supply inlets and sewerage outlets.

XIV. Hot water supply

1. Change of coils and boilers.
2. Change of pipeline, parts and, in general, pumping units, tanks and pipeline insulation.

XV. Electrical lighting and communications

1. Replacement of worn-out sections of the network (more than 10%).
2. Change of safety shields.
3. Repair or restoration of cable channels.
4. When overhauling the network, it is allowed to replace lamps with other types (conventional ones with fluorescent ones).

B. BY STRUCTURES

XVI. Water supply and sewerage facilities

a) Pipelines and network fittings

1. Partial or complete replacement of the anti-corrosion insulation of the pipeline.
2. Change of individual sections of the pipeline (due to pipe wear) without changing the diameter of the pipes. In this case, it is allowed to replace cast iron pipes with steel ones, ceramic ones with concrete or reinforced concrete ones and vice versa, but replacing asbestos-cement pipes with metal ones is not allowed (except in emergency cases).

3. Replacement of worn-out fittings, valves, fire hydrants, plungers, valves, standpipes or repair them with replacement of worn parts.
4. Replacement of individual siphon pipes.

b) Wells

1. Repair of well cages.
2. Change of hatches.
3. Refilling trays to replace destroyed ones.
4. Replacement of wooden wells that have become unusable.
5. Renewal of plaster.

c) Water intakes and hydraulic structures

1. Dams, dikes, spillways, canals

1. Change or replacement of fastenings of banks or slopes in the amount of up to 50%.
2. Refilling of swollen slopes of earthen structures.
3. Change of robes.
4. Renewal of the protective layer in the underwater parts of reinforced concrete structures.
5. Changing gratings and meshes.
6. Repair and replacement of panel shutters.

2. Water wells

1. Construction and dismantling of a drilling rig or installation and dismantling of an inventory drilling rig.
2. Cleaning the well from collapses and siltation.
3. Removing and installing a new filter.
4. Fastening the well with a new column of casing pipes.
5. Replacement of water-lifting and air pipes.
6. Restoring the well's flow rate by torpedoing or flushing with hydrochloric acid.
7. Cementation of the annulus and drilling of cement.

d) Treatment facilities

1. Repair and replacement of complete waterproofing.
2. Repair and renewal of plaster and ironwork.
3. Relaying brick walls and partitions up to 20% of the total volume of masonry in the structure.
4. Sealing leaks in reinforced concrete, concrete and stone walls and bottoms of structures with dismantling the concrete in certain places and re-concreting.
5. Continuous gunite coating of building walls.
6. Repair of drainage around structures.
7. Replacement of tank hatches.
8. Replacing grilles.
9. Replacement of loading filters, biofilters, aerofilters.
10. Changing filter plates.
11. Replacement of pipelines and fittings.
12. Relaying the drainage system of sludge areas.

XVII. District heating

a) Channels and cameras

1. Partial or complete change of coatings of channels and chambers.
2. Partial or complete replacement of waterproofing of channels and chambers.
3. Partial re-lining of the walls of brick channels and chambers (up to 20% of the total surface of the walls).
4. Partial relocation of drainage systems.
5. Repair of channel and chamber bottoms.
6. Renewal of the protective layer in reinforced concrete structures of channels and chambers.
7. Changing hatches.

b) Pipelines and fittings

1. Partial or complete replacement of the thermal insulation of the pipeline.
2. Renewal of pipeline waterproofing.
3. Replacement of individual sections of the pipeline (due to pipe wear) without increasing the diameter of the pipes.
4. Change of fittings, valves, compensators or repair them with replacement of worn parts.
5. Replacement of movable and fixed supports.

XVIII. Access and in-plant railway tracks

a) Subgrade

1. Widening the subgrade in places of insufficient width to normal dimensions.
2. Treatment of the subgrade in areas of landslides, erosion, landslides, and abysses.
3. Restoration of all drainage and drainage systems.
4. Restoration of all protective and fortifying structures of the roadbed (turf, paving, retaining walls).
5. Restoration of regulatory structures.
6. Correction, filling of bridge cones.
7. Replacement of individual structures of artificial structures or their replacement with other structures, as well as complete replacement of pipes and small bridges (if they are not independent inventory objects, but are part of the roadbed).

b) Track superstructure

1. Cleaning the ballast layer or updating the ballast, bringing the ballast prism to the dimensions established by the standards for this type of track.
2. Change of unusable sleepers.
3. Replacement of worn rails.
4. Change of unusable fasteners.
5. Straightening curves.
6. Repair of turnouts with replacement of individual elements and transfer bars.
7. Change of turnouts.
8. Repair of the bridge deck.
9. Changing the crossing flooring or replacing wooden with reinforced concrete.

c) Artificial structures (bridges, tunnels, pipes)

1. Partial replacement of elements or complete replacement of worn-out spans.
2. Partial relaying of stone and brick supports (up to 20% of the total volume).
3. Repair of concrete supports (up to 15% of the total volume).
4. Shotcrete or cementation of the surface of the supports.
5. Installation of reinforcing reinforced concrete shells (jackets) on supports.
6. Repair or complete replacement of insulation.
7. Change of bridge beams.
8. Change of anti-theft bars.
9. Change of wooden flooring.
10. Replacement of reinforced concrete slab flooring.
11. Changing counter rails.
12. Replacement of damaged elements of wooden bridges, with the exception of piles.
13. Replacement of wooden packages with reinforced concrete spans.
14. Partial re-laying of stone and brickwork of the vaults and walls of the tunnels.
15. Injecting cement mortar behind the tunnel lining.
16. Repair and replacement of tunnel drainage devices.
17. Relaying the pipe head.
18. Change of elements of wooden pipes (up to 50% of wood volume).
19. Change of elements of reinforced concrete or concrete pipes (up to 50% of the volume).

XIX. Car roads

a) Subgrade

1. Treatment of the subgrade in areas of landslides, landslides, washouts and abysses.
2. Restoration of all drainage and drainage systems.
3. Restoration of all protective and fortification structures of the roadbed.
4. Replacement of individual structures of artificial structures or their replacement with other structures, as well as complete replacement of pipes and small bridges (if they are not independent inventory objects, but are part of the roadbed or road as a single inventory object).

b) Road clothing

1. Leveling and replacing individual cement-concrete slabs.
2. Laying a leveling layer of asphalt concrete on the cement-concrete surface.
3. Construction of asphalt concrete pavement on roads with cement-concrete pavement.
4. Replacement of cement-concrete covering with a new one.
5. Strengthening the asphalt concrete pavement.
6. Reconstruction of crushed stone and gravel surfaces.
7. Re-paving of pavements.
8. Profiling of dirt roads.

c) Bridges, pipes

1. Partial relaying of stone and brick supports (up to 20% of the total volume).
2. Repair of concrete supports (up to 15% of the total volume).
3. Replacement of damaged elements of wooden bridges, with the exception of piles.
4. Replacement of wooden or reinforced concrete flooring, as well as replacement of wooden flooring with reinforced concrete.
5. Complete change or replacement of spans.
6. Relaying of pipe heads.
7. Change of elements of wooden, reinforced concrete or concrete pipes (up to 50% of the volume).

d) Sites for cars, road construction
and other machines, storage areas, as well as areas
grain collection points

1. Repair and restoration of drainage structures (troughs, ditches, etc.).
2. Re-paving of cobblestone areas.
3. Reconstruction of crushed stone and gravel surfaces of sites.
4. Repair of concrete platforms with laying of a leveling layer of concrete.
5. Leveling and replacing individual cement-concrete slabs.
6. Covering with asphalt concrete the areas listed in paragraphs 2 - 5.

XX. Electrical networks and communications

1. Change or replace unusable fittings.
2. Replacing hooks with traverses.
3. Change of wires.
4. Repair and replacement of end and connecting cable sleeves.
5. Repair or replacement of grounding devices.
6. Change of supports (up to 30% per 1 km).
7. Installation of cable wells.

XXI. Other buildings

1. Repair, replacement or replacement with other supports of overpasses for aerial laying of pipelines.
2. Repair or replacement of platforms, stairs and overpass fences for aerial pipeline installation.
3. Repair or replacement of individual columns (up to 20%) of crane racks.
4. Repair or replacement of crane beams of crane trestles.
5. Repair of galleries and fuel supply racks of boiler houses and gas generator substations with replacement (up to 20%) of structures without changing foundations.
6. Change or complete replacement of wooden fence posts (fences).
7. Repair or replacement of individual concrete and reinforced concrete pillars (up to 20%) and fences (fences).
8. Repair of individual sections of filling between fence posts (up to 40%).
9. Repair of individual sections of solid stone fences (up to 20%).
10. Repair of individual sections of solid adobe fences (up to 40%).
11. Repair of chimneys with replacement or replacement of lining, installation of hoops, restoration of the protective layer of reinforced concrete pipes.
12. Repair and replacement of individual sections of metal chimneys.
13. Repair of ash and slag disposal systems with complete replacement of individual pipeline sections (without increasing the diameter).
14. Repair of loading platforms with a complete change of wooden flooring, blind area or asphalt. Replacement of individual supports or sections of retaining walls (up to 20%). In the event that the unloading area is part of a warehouse facility (ramp), a complete change or replacement of all structures is allowed.

Approximate list of work performed during major repairs of housing stock; Appendix 8 to the Resolution of the State Construction Committee of the Russian Federation dated September 27, 2003 N 170 “On approval of the Rules and Standards for the Technical Operation of the Housing Stock”

SAMPLE LIST
WORK PERFORMED DURING MAIN REPAIRS
HOUSING STOCK

1. Inspection of residential buildings (including a complete inspection of the housing stock) and preparation of design estimates (regardless of the period of repair work).
2. Repair and construction work to replace, restore or replace elements of residential buildings (except for the complete replacement of stone and concrete foundations, load-bearing walls and frames).
3. Modernization of residential buildings during their major renovation (redevelopment taking into account the disaggregation of multi-room apartments; installation of additional kitchens and sanitary facilities, expansion of living space due to auxiliary premises, improvement of insolation of residential premises, elimination of dark kitchens and entrances to apartments through kitchens with devices, with necessary, built-in or attached premises for staircases, sanitary facilities or kitchens); replacement of stove heating with central heating with the installation of boiler rooms, heat pipelines and heating points; rooftop and other autonomous heat supply sources; refurbishment of furnaces to burn gas or coal; equipment with cold and hot water supply systems, sewerage, gas supply with connection to existing main networks at a distance from the input to the connection point to the main lines up to 150 m, installation of gas ducts, water pumps, boiler rooms; complete replacement of existing central heating systems, hot and cold water supply (including the mandatory use of modernized heating devices and pipelines made of plastic, metal-plastic, etc. and a ban on the installation of steel pipes); installation of household electric stoves instead of gas stoves or kitchen fires; installation of elevators, garbage chutes, pneumatic garbage removal systems in houses with a landing of the upper floor of 15 m and above; transfer of the existing power supply network to higher voltage; repair of television antennas for collective use, connection to telephone and radio broadcasting networks; installation of intercoms, electric locks, installation of automatic fire protection and smoke removal systems; automation and dispatching of elevators, heating boiler houses, heating networks, engineering equipment; improvement of courtyard areas (paving, asphalting, landscaping, installation of fences, wood sheds, equipment of children's and utility areas). Repair of roofs, facades, joints of prefabricated buildings up to 50%.
4. Insulation of residential buildings (work to improve the heat-insulating properties of enclosing structures, installation of triple-glazed window fillings, installation of external vestibules).
5. Replacement of intra-block utility networks.
6. Installation of meters for metering thermal energy consumption for heating and hot water supply, cold and hot water consumption for the building, as well as installation of apartment meters for hot and cold water (when replacing networks).
7. Reconstruction of unventilated combined roofs.
8. Design supervision of design organizations for major repairs of residential buildings with full or partial replacement of floors and redevelopment.
9. Technical supervision in cases where local government bodies and organizations have created units for technical supervision of major repairs of housing stock.
10. Repair of built-in premises in buildings.

List of works for major repairs of buildings and structures; Appendix 9 to Order of the Ministry of Justice of Russia dated September 28, 2001 N 276 (as amended on January 24, 2006) “On approval of instructions for the technical operation of buildings and structures of institutions of the penal system”)

Appendix 9

LIST OF WORK FOR MAIN REPAIRS OF BUILDINGS AND STRUCTURES

1.1. Foundations.
1.1.1. Changing wooden chairs or replacing them with stone or concrete pillars.
1.1.2. Partial relaying (up to 15%), as well as strengthening of foundations and basement walls under external and internal walls and pillars of stone and wooden buildings, not associated with the superstructure of the building or with additional loads from newly installed equipment.
1.1.3. Strengthening the foundations of stone buildings not connected with the building's superstructure.
1.1.4. Restoration of vertical and horizontal insulation of foundations.
1.1.5. Restoring a settled existing area or constructing a new blind area around the building (more than 20% of the total area of ​​the blind area) in order to protect the soil under the foundations from erosion or waterlogging.
1.1.6. Repair of brick lining of foundation walls on the basement side in separate places with relaying more than 10 bricks in one place.
1.1.7. Partial or complete restoration or installation of new waterproofing in basements.
1.1.8. Partial or complete relocation of pits near basement and ground floor windows.
1.1.9. Replacement of rotted wooden foundation chairs in wooden buildings with new wooden, brick, concrete or reinforced concrete pillars.
1.1.10. Repair of existing drains around the building.
1.1.11. Replacement of single collapsing stone and concrete pillars.
Note. Using funds for major repairs, it is possible to artificially stabilize foundation soils using chemical, thermal and other methods.

1.2. Walls and columns.
1.2.1. Relaying brick plinths (more than 10 bricks in one place).
1.2.2. Sealing cracks in brick or stone walls, clearing grooves, and bandaging seams with old masonry.
1.2.3. Construction and repair of structures that strengthen stone walls.
1.2.4. Relining dilapidated brick cornices, lintels, parapets, pits and protruding parts of walls.
1.2.5. Complete or partial relaying and fastening of individual dilapidated sections of brick walls (up to 25% of their total area in the building), not related to the building’s superstructure or additional loads from newly installed equipment, as well as replacement of individual crowns in wooden buildings, not exceeding 25% general surface of the walls.
1.2.6. Strengthening walls with tension and metal ties.
1.2.7. Change of fillings in walls with stone, reinforced concrete and metal frames (up to 40%).
1.2.8. Sealing cracks in brick walls with excavation and clearing of old masonry and installation of new, with ligation of seams with old masonry.
1.2.9. Restoration of the waterproofing layer of the entire horizontal plane along the edge of the foundation.
1.2.10. Fastening or strengthening of stone walls that deviate from the vertical position and have deformations.
1.2.11. Re-lining dilapidated cornices, parapets, firewalls, pits and protruding parts of walls.
1.2.12. Replacement of individual window and door lintels that have become unusable.
1.2.13. Insulation of dilapidated wooden walls by laying boards over roofing felt or with additional sheathing with boards and backfilling with fine slag.
1.2.14. Partial dismantling of existing internal walls and laying new ones (up to 25% of the total volume), associated with the redevelopment of premises.
1.2.15. Replacement of various types of fillers in walls with stone, reinforced concrete and metal frames (up to 50% of the total wall area).
1.2.16. Replacement of dilapidated crowns of log or cobblestone walls (up to 20%).
1.2.17. Continuous caulking of log or cobblestone walls.
1.2.18. Partial replacement of sheathing, backfill and slab insulation of frame walls (up to 50% of the total wall area).
1.2.19. Replacement or repair of cladding and insulation of wooden plinths.
1.2.20. Repair of stone plinths of wooden walls with their re-lining up to 50% of the total volume.
1.2.21. Re-installation and replacement of worn-out clamps of log and cobblestone walls.
1.2.22. Strengthening reinforced concrete and stone columns with clips.
1.2.23. Repair and partial replacement (up to 20%) of columns not associated with additional loads from newly installed equipment.

1.3. Partitions.
1.3.1. Repair, replacement and replacement of worn partitions with more advanced designs.
1.3.2. Partial redevelopment with an increase in the total area of ​​the partitions (up to 20%).
1.3.3. Repair of partitions with replacement of unusable frames and boards in an amount of more than 2 m2 in one place.
1.3.4. Strengthening the sound insulation of partitions by upholstering them with an additional layer of hardboard, cardboard or other materials, followed by applying a layer of plaster, wallpapering or painting.
1.3.5. Replenishment of backfill for two-layer partitions, followed by sealing with boards and performing all finishing work.

1.4. Roofs and roofs.
1.4.1. Replacement of formwork boards in areas of valleys and eaves slopes.
1.4.2. Replacement of dilapidated roof structures with a roof made of ready-made reinforced concrete elements covered with roofing felt, roofing felt and other roofing materials.
1.4.3. Complete or partial replacement of dilapidated metal and reinforced concrete trusses.
1.4.4. Strengthening trusses when replacing types of coatings (wooden panels with prefabricated reinforced concrete, cold coatings with warm ones, etc.), as well as with corrosion of components and other elements of metal and prefabricated reinforced concrete trusses.
1.4.5. Partial or complete replacement of rafters, mauerlats and roof sheathing.
1.4.6. Repair or replacement of worn metal fences on roofs.
1.4.7. Repair or replace worn out exterior fire escapes.
1.4.8. Construction of new roof hatches, dormer windows and transition bridges to them.
1.4.9. Relocation of chimney and ventilation pipes on the roof.
1.4.10. Complete replacement of worn-out wall gutters, drains and coverings around chimneys and other protruding devices above the roof.
1.4.11. Conversion of skylights from low-illumination rooms to high-illumination.
1.4.12. Repair and painting of load-bearing structures of skylights.
1.4.13. Repair of mechanical and manual opening and closing devices for skylight covers.
1.4.14. Partial or complete replacement of dilapidated covering elements, as well as their replacement with more advanced and durable ones.
1.4.15. Partial (more than 10%) or complete change or replacement of the roof (all types).
1.4.16. Reconstruction of roofs due to replacement of roofing materials.
1.4.17. Repair of coatings around chimneys and ventilation pipes, firewalls, parapets and other protruding parts on the roof.
1.4.18. Strengthening parapets, steel fencing bars, repairing the heads of ventilation shafts, gas ducts, sewer risers and other protruding parts on the roof.
1.4.19. Restoration and repair of stepladders for safe cleaning of chimneys on roofs with soft coverings or those with steep slopes.
1.4.20. Maintaining exterior fire escapes to reach the roof.

1.5. Interfloor ceilings and floors.
1.5.1. Repair or replacement of interfloor and attic floors.
1.5.2. Replacement of individual floor beams, extension of the ends of beams with prosthetics and all subsequent work. Replacing the selection between beams.
1.5.3. Replacement of individual structures or floors as a whole with more advanced and durable structures.
1.5.4. Strengthening all elements of interfloor and attic floors.
1.5.5. Shotcrete of reinforced concrete floors in case of their damage.
1.5.6. Partial (more than 10%) or complete replacement of floors (all types) and their bases.
1.5.7. Reconstruction of floors during repairs with replacement with stronger and more durable ones, while the type of floors must comply with the requirements of standards and technical conditions for new construction.
1.5.8. Restoration of the concrete base under the floors with the installation of a new floor.
1.5.9. Re-laying clean plank floors with leveling joists and adding new material.
1.5.10. Re-laying of parquet floors with correction or replacement of sheathing.
1.5.11. Re-laying floors on joists on the first floors, correcting or replacing the base and restoring brick columns.
1.5.12. Repair or replacement of walls of underground channels.

1.6. Windows, doors and gates.
1.6.1. Complete replacement of dilapidated window and door units, as well as gates.

1.7. Stairs and porches.
1.7.1. Partial or complete replacement of staircases, ramps and porches.
1.7.2. Replacement or strengthening of all types of stairs and their individual elements.
1.7.3. Replacement or repair of railings and handrails of stairs over 5% of their total number.
1.7.4. Construction of new porches.
1.7.5. Changing metal stringers or welding damaged parts of stringers.

1.8. Internal plastering, tiling and painting works.
1.8.1. Resumption of plastering of all premises and repair of plaster in the amount of more than 10% of the total plastered surface.
1.8.2. Upholstery of walls and ceilings with dry plaster.
1.8.3. Restoration or replacement of wall surface cladding in an amount of more than 10% of the total area of ​​cladding surfaces.
1.8.4. Renewal of stucco details indoors.
1.8.5. Painting of window frames, doors, ceilings, walls and floors after major repairs of these structures.
1.8.6. Oil painting of radiators, heating pipes, water supply, sewerage, gasification after major repairs of the system or its new installation, if the costs are covered by capital repair funds.
1.8.7. Continuous anti-corrosion painting of metal structures.

1.9. Facades.
1.9.1. Repair and renewal of cladding of an area of ​​more than 10% of the lined surface of building facades with the replacement of individual tiles with new ones or plastering of these places with subsequent painting to match the color of the cladding slabs.
1.9.2. Complete or partial (more than 10%) restoration of plaster.
1.9.3. Restoration or alteration of rods, cornices, corbels, sandriks and other protruding parts of building facades.
1.9.4. Complete replacement and installation of new drainpipes, as well as all external metal and cement coatings on protruding parts of building facades.
1.9.5. Restoration of moldings and moldings and details.
1.9.6. Continuous painting of building facades with stable compounds.
1.9.7. Replacement or installation of new gratings and fences on the roofs and balconies of buildings.
1.9.8. Cleaning of facades and plinths with sandblasting machines.
1.9.9. Replacement or strengthening of all load-bearing and enclosing structures of balconies and bay windows.
1.9.10. Changing the coverings of protruding parts of the building.
1.9.11. Restoring old or installing new gates.
1.9.12. Oil painting of facades of wooden buildings.

1.10. Stoves and hearths.
1.10.1. Repair, alteration and installation of new stoves, kitchen hearths, built-in boilers and chimneys for them.
1.10.2. Complete refurbishment or installation of new heating stoves, chimneys, ventilation ducts and chimneys and their bases.
1.10.3. Conversion of heating stoves from wood to gas heating or solid fuel heating.

1.11. Central heating.
1.11.1. Installation of central heating instead of a stove with adaptation of an existing room for a boiler room and installation of a boiler room. In some cases, if it is impossible to adapt existing premises for a boiler room, it is permitted to make an extension to an existing building with a building area of ​​no more than 65 m2 or to build a new boiler room building.
1.11.2. Replacement of individual sections and assemblies of heating boilers, boilers, boiler units or complete replacement of boiler units (if they are not independent inventory items).
1.11.3. Replacement of existing central heating piping.
1.11.4. Repair and replacement of expanders, condensation traps and other network equipment.
1.11.5. Installation of remote furnaces and accessories for boilers under a forced-air furnace.
1.11.6. Replacement and installation of additional sections of heating devices and individual sections of the pipeline.
1.11.7. Repair, re-laying or re-installation of foundations for boilers and other equipment.
1.11.8. Boiler room automation.
1.11.9. Replacement of insulation of pipelines that have become unusable.
1.11.10. Re-lining the boiler and chimneys.
1.11.11. Installing patches on a steel boiler, boiler, steam tank, tank.
1.11.12. Manufacturing and installation of a new casing.
1.11.13. Restoration or installation of new lining and lining of central heating boilers.
1.11.14. Replacement of deteriorated metal chimneys from boiler rooms.
1.11.15. Changing heating registers.
1.11.16. Connecting buildings to heating networks (at a distance from the building to the network of no more than 100 m).

1.12. Ventilation.
1.12.1. Installation of a new, restoration or reconstruction of the ventilation system.
1.12.2. Partial or complete replacement of air ducts.
1.12.3. Changing fans.
1.12.4. Rewinding or changing electric motors.
1.12.5. Change of dampers, deflectors, throttle valves, blinds.
1.12.6. Partial or complete replacement of ventilation ducts.
1.12.7. Changing heaters.
1.12.8. Change of heating units.
1.12.9. Changing filters.
1.12.10. Change of cyclones.
1.12.11. Change of individual designs of ventilation chambers.

1.13. Water supply and sewerage.
1.13.1. Restoration or installation of a new internal water supply and sewerage system of the building, pipelines, including water supply and sewerage inlets and their connection to the water supply and sewerage networks. The length of the line from the nearest water supply inlet or sewer outlet to the street network should not exceed 100 m.
1.13.2. Installation of new water outlets indoors.
1.13.3. Installation of additional inspection wells on existing yard lines or street networks at connection points.
1.13.4. Relaying underground water and sewer lines.
1.13.5. Replacement of cast-iron toilet cisterns with flush taps, alteration of the liner and shortening of the flush pipe.
1.13.6. Replacement of taps, valves and sanitary fixtures.
1.13.7. Construction of water pumps.
1.13.8. Construction of new sanitary facilities.

1.14. Hot water supply.
1.14.1. Change and installation of new hot water supply.
1.14.2. Replacement of individual sections of the hot water supply pipeline.
1.14.3. Replacement of tanks, water heaters and water heaters that have become unusable.
1.14.4. Repair of tanks, coils and boilers, involving complete disassembly and replacement of individual components and parts.
1.14.5. Replacement of pipelines, parts and, in general, pumping units, tanks and pipeline insulation.
1.14.6. Replacement and installation of bathtubs, showers and fittings for them (shower nets with pipelines, water taps, flexible hoses).

1.15. Electrical lighting, communications and power wiring.
1.15.1. Installation of new electric lighting in residential and public buildings and connection to the power supply network.
1.15.2. Replacing lighting wiring that has become unusable with a change of installation fittings (switches, circuit breakers, plugs, sockets, sockets), and during a major renovation of a building - installation of new electrical wiring.
1.15.3. Installation of new and replacement of group distribution and fuse boxes and panels.
1.15.4. Reconstruction of electrical wiring with the installation of additional fittings in connection with the redevelopment of premises.
1.15.5. Automation of electric lighting in building staircases.
1.15.6. Replacement of metering devices and electrical installation protection devices.
1.15.7. Repair or restoration of cable channels.
1.15.8. Replacement of lamps with other types (conventional with fluorescent ones, etc.).

1.16. Gas supply.
1.16.1. Installation of additional gas equipment in apartments with its connection to the gas network.
1.16.2. Gasification of individual apartments.
1.16.3. Replacement of individual sections of the gas pipeline.
1.16.4. Replacement of worn-out equipment (gas stoves, water heaters) with new equipment.

1.17. Elevators and lifts.
1.17.1. Re-installation of elevators with all types of construction and installation work.
1.17.2. Complete or partial replacement of electrical equipment and cargo winches of the elevator.
1.17.3. Strengthening, complete or partial replacement of metal structures and mine enclosing mesh.
1.17.4. Complete or partial replacement of electrical wiring in mines.
1.17.5. Dismantling and installation of elevator equipment in connection with work to reduce noise in rooms with constant occupancy.
1.17.6. Automation of elevators.

2. Facilities

2.1. Water supply and sewerage facilities. Pipelines and network fittings.
2.1.1. Partial or complete replacement of anti-corrosion pipeline insulation.
2.1.2. Changing individual sections of the pipeline without changing the diameter of the pipes. In this case, it is allowed to replace cast iron pipes with steel ones, ceramic ones with concrete or reinforced concrete ones and vice versa, but replacing asbestos-cement pipes with metal ones is not allowed (except in emergency cases).
The length of network sections where continuous replacement of pipes is allowed should not exceed 200 m per 1 km of network.
2.1.3. Replacement of worn fittings, valves, fire hydrants, plungers, valves, water standpipes or their repair with replacement of worn parts.
2.1.4. Replacement of individual siphon pipes.

2.2. Water supply and sewerage networks. Wells.
2.2.1. Repair of masonry wells.
2.2.2. Changing hatches.
2.2.3. Refilling trays to replace destroyed ones.
2.2.4. Replacement of deteriorated wooden wells.
2.2.5. Renewal of plaster.

2.3. Water supply and sewerage networks. Treatment facilities.
2.3.1. Repair or replacement (completely) of waterproofing.
2.3.2. Repair and renewal of plaster and ironwork.
2.3.3. Relaying brick walls and partitions (up to 20% of the total volume of masonry in the structure).
2.3.4. Sealing leaks in reinforced concrete, concrete and stone walls and the bottoms of structures with dismantling the concrete in certain places and concreting again.
2.3.5. Continuous gunite coating of building walls.
2.3.6. Repairing drainage around structures.
2.3.7. Replacement of tank hatches.
2.3.8. Replacing gratings.
2.3.9. Replacement of loading filters, biofilters, aerofilters.
2.3.10. Replacement of pipelines and fittings.
2.3.11. Changing filter plates.
2.3.12. Relaying the drainage system of sludge beds.

2.4. District heating. Channels and cameras.
2.4.1. Partial or complete change of coatings of channels and chambers.
2.4.2. Partial or complete replacement of waterproofing of channels and chambers.
2.4.3. Partial re-lining of the walls of brick channels and chambers (up to 20% of the total surface of the walls).
2.4.4. Partial relocation of drainage systems.
2.4.5. Repair of channel and chamber bottoms.
2.4.6. Renewal of the protective layer in reinforced concrete structures of channels and chambers.
2.4.7. Changing hatches.

2.5. District heating. Pipelines and fittings.
2.5.1. Partial or complete replacement of pipeline thermal insulation.
2.5.2. Resumption of waterproofing of pipelines.
2.5.3. Replacement of individual sections of the pipeline without increasing the diameter of the pipes.
2.5.4. Change of fittings, valves, compensators or repair them with replacement of worn parts.
2.5.5. Replacement of moving and fixed supports.

2.6. Car roads. Subgrade.
2.6.1. Treatment of subgrade in areas of landslides, landslides, washouts and abysses.
2.6.2. Restoration of drainage and drainage systems.
2.6.3. Restoration of protective and fortification structures of the roadbed.
2.6.4. Replacement of individual structures of artificial structures or their replacement with other structures, as well as complete replacement of pipes and small bridges (if they are not independent inventory objects, but are part of the roadbed or road as a single inventory object).

2.7. Car roads. Travel clothing.
2.7.1. Leveling and replacing individual cement-concrete slabs.
2.7.2. Laying a leveling layer of asphalt concrete on a cement-concrete surface.
2.7.3. Installation of asphalt concrete pavement on roads with cement-concrete pavement.
2.7.4. Replacement of cement-concrete pavement with a new one.
2.7.5. Strengthening asphalt concrete pavement.
2.7.6. Reconstruction of crushed stone and gravel surfaces.
2.7.7. Re-paving of pavements.
2.7.8. Profiling of dirt roads.

2.8. Warehouse and other sites.
2.8.1. Repair and restoration of drainage structures (troughs, ditches, etc.).
2.8.2. Re-paving cobblestone areas.
2.8.3. Reconstruction of crushed stone and gravel surfaces of sites.
2.8.4. Repair of concrete platforms with laying of a leveling layer of concrete.
2.8.5. Leveling and replacement of individual cement-concrete platforms.
2.8.6. Covering sites with asphalt concrete.

2.9. Electrical networks and communications.
2.9.1. Change or replace fittings.
2.9.2. Replacing hooks with traverses.
2.9.3. Change of wires.
2.9.4. Repair and replacement of end and connecting cable couplings.
2.9.5. Repair or replacement of grounding devices.
2.9.6. Change of supports (up to 30% per 1 km).
2.9.7. Installation of cable wells.

2.10. Other buildings.
2.10.1. Repair, replacement or replacement with other supports of overpasses for aerial laying of pipelines.
2.10.2. Repair and replacement of platforms, stairs and overpass fences for aerial laying of pipelines.
2.10.3. Repair or replacement of individual columns (up to 20%) of crane trestles.
2.10.4. Repair or replacement of crane beams of crane trestles.
2.10.5. Repair of galleries and fuel supply racks of boiler and gas generator substations with replacement (up to 20%) of structures without changing foundations.
2.10.6. Replacement or complete replacement of wooden fence posts.
2.10.7. Repair or replacement of individual concrete and reinforced concrete pillars (up to 20%) of fences.
2.10.8. Repair of individual sections of fencing elements (up to 40% filling between posts).
2.10.9. Repair of individual sections of solid stone fences (up to 20%).
2.10.10. Repair of individual sections of solid adobe fences (up to 40%).
2.10.11. Repair of chimneys including changing or replacing the lining, installing hoops, and restoring the protective layer of reinforced concrete pipes.
2.10.12. Repair and replacement of individual sections of metal chimneys.
2.16.13. Repair of ash and slag disposal systems with complete replacement of individual pipeline sections (without increasing the diameter).
2.12.14. Repair of loading platforms with complete replacement of wooden flooring, blind area or asphalt. Replacement of individual supports or sections of retaining walls (up to 20%). If the unloading area is part of a warehouse facility (ramp), a complete change or replacement of all structures is allowed.

List of works on major repairs of apartment buildings to be included in the work financed from the funds provided for by Federal Law N 185-FZ; Table 2.3 ( "Methodological recommendations for the formation of the scope of work for the overhaul of apartment buildings financed from funds provided for by Federal Law of July 21, 2007 N 185-FZ "On the Fund for Assistance to the Reform of Housing and Communal Services" (approved by the State Corporation "Fund for Assistance to the Reform of Housing and Communal Services" 02/15/2013)

This list is formed on the basis of updated lists of major repair work recommended by the above regulatory documents within the framework of the types of major repair work of apartment buildings defined by Article 15 of Federal Law N 185-FZ. It is assumed that the provisions of these guidelines apply to apartment buildings that are subject to major repairs without stopping their operation. As a result of the major repairs, all necessary work must be carried out to bring the common property of an apartment building into a technically sound condition by restoring or replacing all parts of structures and engineering systems that have a shorter service life between the next (according to the standard service life) major repairs than bearing structures.

2.3.2. Consistent and methodical linking of technological processes to the list of works given in Table 2.3 of these recommendations is contained in Section 3.

Table 2.3

Name of types of work in accordance with Part 3 of Article 15 of Federal Law N 185-FZ

Subtypes and list of works

Repair of in-house engineering systems of electrical, heat, gas, water supply, and sanitation

1. Repair or replacement of engineering systems:

1.1. Cold water supply, including:

1.1.1. Repair or replacement of water meter units;

1.1.2. Repair or replacement of distribution lines and risers;

1.1.3. Replacement of shut-off valves, including those on the branch from the risers into the apartment;

1.1.4. Repair or replacement of equipment for booster pumping units

1.1.5. Repair or replacement of equipment, pipelines and fire water supply equipment

1.2. Repair or replacement of hot water supply system, including:

1.2.1. Repair or replacement of heat exchangers, heat exchangers, boilers, pumping units and other equipment (as part of common property) in the complex for preparing and supplying hot water to the distribution network;

1.2.2. Repair or replacement of distribution lines and risers;

1.2.3. Replacement of shut-off valves, including those on the branch from the risers into the apartment.

1.3. Repair or replacement of sewerage and wastewater systems, including:

1.3.1. Repair or replacement of outlets, prefabricated pipelines, risers and hoods;

1.3.2. Replacement of valves, if any;

1.4. Repair or replacement of the heating system, including;

1.4.1. Repair or replacement of distribution lines and risers;

1.4.2. Replacement of shut-off and control valves, including on the branch from risers to heating devices in residential premises;

1.4.3. Rearrangement or replacement of heating devices in common areas and replacement of heating devices in residential premises that do not have shut-off devices;

1.4.4. Installation, repair or replacement of ITP (individual heating points) equipment in a complex and in the presence of booster pumping units

1.5. Repair or replacement of the gas supply system, including:

1.5.1. Repair or replacement of intra-house distribution lines and risers;

1.5.2. Replacement of shut-off and control valves, including on the branch from risers to household gas appliances in residential premises;

1.6. Repair or replacement of the electrical supply system, including:

1.6.1. Repair or replacement of main distribution board (main distribution board), distribution and group boards;

1.6.2. Repair or replacement of intra-house distribution lines and risers for utility and apartment lighting;

1.6.3. Replacement of branches from floor panels or boxes of apartment meters and installation and lighting devices for public lighting;

1.6.4. Replacement of electrical networks to power electrical equipment of elevators and electrical equipment to ensure the operation of engineering systems;

2. Modernization of engineering systems, including:

2.1. Mandatory use of modernized heating devices and pipelines made of plastic, metal-plastic, etc. and a ban on the installation of steel pipes

2.2. Conversion of the existing power supply network to higher voltage;

2.3. Replacement of lighting fixtures for public lighting needs with energy-saving ones;

2.4. Re-equipment of heating points and water metering units;

3. Replacing stove heating with central heating

with device

boiler rooms,

heat pipelines and

heating points;

rooftop and other autonomous heat supply sources

4. Equipment systems

cold and

hot water supply,

sewerage,

gas supply

with accession

to existing trunk networks at a distance from the input to the point of connection to the highways up to 150 m,

device

flues,

water pump,

boiler rooms

Repair or replacement of elevator equipment deemed unsuitable for operation, and, if necessary, repair of elevator shafts

Repair and replacement of elevator equipment with its modernization, including:

1. Repair or complete replacement of elevator equipment deemed unsuitable for operation;

2. Repair, if necessary, shafts, replacement of attached shafts;

3. Repair of machinery spaces;

4. Repair, replacement of automation elements and dispatching of elevator equipment;

5. Equipment of devices necessary for connection to existing automation and dispatch systems of elevator equipment

Roof repair

1. Repair of roof structures:

1.1. From wooden structures:

1.1.1. Repair: with partial replacement

rafter legs,

Mauerlatov

Solid and loose battens made of bars

1.1.2. Antiseptic and fireproofing of wooden structures.

1.1.3. Insulation of the under-roof (attic) floor

1.1.4. Repair (replacement of dormer windows)

1.2. From reinforced concrete rafters and roofing decks:

1.2.1. Troubleshooting reinforced concrete rafters and roofing decks;

1.2.2. Insulation of the under-roof (attic) floor

1.2.3. Repair of roofing screeds;

2. Replacement of roof coverings

2.1. Complete replacement of metal roof coverings with connections;

2.2. Complete replacement of the roof covering made of rolled bitumen materials (roofing felt) with roofing materials made of fused materials with an abutment device

2.3. Complete replacement of the roof covering made of piece materials (slate, tiles, etc.) with connections

3. Repair or replacement of the drainage system (overhangs, gutters, gutters, trays) with replacement of drainpipes and products (external and internal);

4. Repair or replacement of roofing elements

4.1. Repair of roof hatches

4.2. Repair of vents, repair or replacement of dormer windows and other devices for ventilation of the attic space;

4.3. Changing caps on the heads of smoke ventilation units and ventilation shafts;

4.4. Changing the coverings of parapets, firewalls, superstructures

4.5. Repair (plastering, painting) and insulation of smoke ventilation blocks and elevator shafts

4.6. Restoration or replacement of fencing on the attic roof;

5. Conversion of unventilated combined roofs to ventilated ones with insulation of the under-roof (attic) floor

Repair of basements belonging to common property in apartment buildings

1. Repair of sections of basement walls and floors

2. Insulation of walls and basement floors of basements

3. Waterproofing basement walls and floors

4. Repair of technical premises with installation of metal doors.

5. Repair of vents, basement windows, pits and external doors

6. Sealing the passages of inputs and outputs of utility networks in external walls (performed when repairing networks)

7. Repair of the blind area

8. Repair or replacement of the drainage system

Insulation and repair of facades

1. Repair of facades that do not require insulation

1.1. Repair of plaster (textured layer), including architectural order;

1.2. Repair of facing tiles;

1.3. Painting over plaster or textured layer;

1.4. Repair and restoration of sealing of horizontal and vertical joints of wall panels of large-block and large-panel buildings;

1.5. Repair and restoration of sealing joints of window and door openings of common areas on the façade side;

1.6. Painting the façade side of window sashes;

1.7. Repair of boundary walls;

1.8. Repair and replacement of windows and balcony doors (as part of common property);

1.9. Repair or replacement of external entrance doors.

2. Repair work on facades that require insulation

2.1. Repair and insulation of enclosing walls with subsequent finishing of surfaces

2.2. Repair of windows and balcony doors (as part of common property) or replacement with windows and doors in an energy-saving design (window units with triple glazing, etc.) with their subsequent insulation (sealing)

2.3. Repair of external entrance doors with their subsequent insulation or replacement with metal doors in an energy-saving design

3. Work common to both groups of buildings

3.1. Repair of balconies with replacement of consoles if necessary, waterproofing and sealing followed by painting

3.2. Strengthening canopy structures above entrances and top floors with subsequent surface finishing

3.3. Strengthening the structures of cornice blocks with subsequent finishing of surfaces

3.4. Changing window sills

3.5. Changing drain pipes

3.6. Basement repair and insulation

Installation of collective (common house) meters for resource consumption and control units (heat energy, hot and cold water, electricity, gas)

Installation of collective (common house) consumption meters:

Thermal energy for heating and hot water supply needs;

Cold water consumption,

Electrical energy,

Resource management nodes, with equipment for automation and dispatching devices to ensure remote accounting and control;

Repair of foundations of apartment buildings.

1. Repair or replacement of foundations.

1.1. Sealing and filling joints, seams, cracks in foundation elements. Installation of a protective layer.

1.2. Elimination of local defects and deformations by strengthening the foundation.

Notes:

1. When overhauling structures and engineering systems as part of the common property of an apartment building, as defined by Federal Law 185-FZ, at least 50% of each structure and engineering system is replaced.

2. In-house heating systems as part of common property include: risers, heating elements in common areas, in residential premises - branches from the risers to the first disconnecting device (in its absence - to the point of interface with the heating device, heating element), regulating and shut-off valves; collective (household) heat energy metering devices, as well as other equipment located on these networks.

3. If, when carrying out major repairs of structures and engineering systems as part of the general property of the MD, due to the technological and design features of the structures and engineering systems being repaired (replaced), it is necessary to dismantle or destroy parts of the property that are not part of the common property of the MD , work to restore it is carried out at the expense of capital repairs, which must be provided for in the design and estimate documentation.

4. If a heating system with a hidden piping is designed in an apartment building, which is not repairable (Appendix 2), during major repairs it is allowed to re-install a heating system with open piping and heating devices, heating elements, including in residential areas.



Did you like the article? Share with your friends!